Dinu, Laurentiu RazvanLaurentiu RazvanDinu2017-03-292017-03-2920112012http://hdl.handle.net/123456789/548Sectorial MECMA, contract Contract 13/ 24.10.2011The main project objective was to evaluate ""High Density Sludge for ARD treatment. Study site laboratory tests to treat mine water - site Fata Mare Detailed design for on-site pilot plant, Qmax = 1 m3/h, adequate for HDS process study on Fata Mare site. Procurement and sub-systems assembly. Permitting issues management - town planning, water management, environment, MECMA DGRM, CONVERSMIN, industrial on-site operator. Pilot plant installation at the Fata Mare site. Piloting and optimization and performance evaluation for the Geco Noranda HDS alternative. On-site workshop and on-site demonstration."en-USHDSMine waterWater managementResearch and on-site pilot level study for the ""High Density Sludge"" (HDS) technology for mine water treatmentProject